top of page

 Our Drain Services Projects

Here are few of many projects that Aquatech have completed:

Client: Felce & Guy Partnership

Location: South Lodge Hotel and Spa

Works: 

The contract will consist of:
• New temporary road into site
• Multi utility trench - Power, Telecommunications and fresh water mains
• Tankering & De-silting of Pond
• Excavation
• New PCC Wetwell pumping station.
• New 180mm fusion wielded HDPE drainage.
• New drainage system installation.
• New 125mm MDPE rising main.
• New sustainable water storage
• Refilling of Pond.

Client: Sov Commercial

Location: Langney Shopping Centre

Works: 

The contract consisted of:
• 34m of new heavy duty ACO drainage.
• 40m of new surface water below ground drainage.
• 3000L 3 stage Separator installation
• 2 x precast concrete catch pits.
• 4m deep main sewer connection.

Client: Developer

Location: Daybrook Rd, London

Works: 

The contract consisted of:
• Thames Water foul and surface water sewer diversion.
• 3 x new inspection chambers installed.
• 30m of new 150mm diameter clay sewer pipe installation.
• All in accordance with Thames Water specification.

Client: Property Management Company

Location: Brighton, East Sussex

Works: A new 8x Polystorm Soakaway Installation serving the Surface Water Run Off.

Client: Chalk Nightclub

Location: Brighton, East Sussex

Works: 4,500L sewage pumping chamber install to discharge foul water from the soil stack to the main sewer.

Client: Homeowner

Location: East Sussex

Works: Main sewer diversion for a new build. Installing new 150mm clay pipe specified by Southern Water to resist high pressures

Client: Mildren Construction

Location: A27 By-pass, West Sussex

Works: Installment of 3 Local Patch liners to repair damaged storm water drain under the highway

Client: Clancy Docwra

Location: Horsham, West Sussex

Works: Installment of 6" clay sewer pipe by excavation and moling 

Client: Management Agency

Location: Brighton, East Sussex

Works: Drain repair of root removal and patch liner to seal broken joint that serves a block of flats

Client: Technetix Ltd

Location: Albourne, West Sussex

Works: Instalment of 20m of Industrial ACO channel drainage to discharge all surface water and reduce any flooding.

Client: Home-owner

Location: Brighton, East Sussex

Works: Reconfigure of the Southern Water Sewer for a new extension on a property as per southern water specification.

Client: HOP Consulting Civil and Structural Engineers

Location: Shoreham, West Sussex

Works: CCTV drain survey of 300 & 525 mm main sewer for a new development

Client: Commercial Client

Location: Hastings, East Sussex

Works: Drain repair patch lining to the structurally damages 225mm main sewer for an Industrial estate.

Client: EDF Energy

Location: Brighton, East Sussex

Works: Installation of new M200 ACO Drainage to prevent further flooding and surface water issues.

Client: Homeowner

Location: Haywards Heath, West Sussex

Works: Southern Water Sewer Diversion for a new extension build over.

Client: Property Management Company

Location: Lewes, East Sussex

Works: 900mm Diameter Culvert Cleaning using our 18T Combi Tanker Unit.

Client: Moretons Investments

Location: Brighton, East Sussex

Works: 2x 2400 litres Sewage Pumping Stations Installed for a new Residential Development.

Client: Homeowner

Location: Hassocks, West Sussex

Works: Installation of new Surface Water Drainage with the connection to the Southern Water Main Sewer. 

bottom of page