Our Drain Services Projects
Here are few of many projects that Aquatech have completed:
Client: Technetix Ltd
Location: Albourne, West Sussex
Works: Instalment of 20m of Industrial ACO channel drainage to discharge all surface water and reduce any flooding.
Client: Glynde House
Location: Hove, East Sussex
Works: Soakaway install to discharge storm water from road gully, holding a capacity of 1,200 litres of surface water
![]() Cut-out of soakway hole | ![]() Excavating hole for storm crates |
---|---|
![]() storm crates wrapped for protection | ![]() Road gully connection into soakaway |
![]() Fully surrounded in shingle | ![]() Concrete finish |
Client: Chalk Nightclub
Location: Brighton, East Sussex
Works: 4,500L sewage pumping chamber install to discharge foul water from the soil stack to the main sewer.
Client: Homeowner
Location: East Sussex
Works: Main sewer diversion for a new build. Installing new 150mm clay pipe specified by Southern Water to resist high pressures
Client: Mildren Construction
Location: A27 By-pass, West Sussex
Works: Installment of 3 Local Patch liners to repair damaged storm water drain under the highway
![]() Highway drainage patch repair | ![]() patch liner |
---|---|
![]() Drain lining | ![]() installment of drain lining |
![]() drain repair completion |
Client: Clancy Docwra
Location: Horsham, West Sussex
Works: Installment of 6" clay sewer pipe by excavation and moling
![]() Sub-contracting for Clancy Docwra | ![]() Moling for new sewer pipe |
---|---|
![]() Main sewer pipe installed | ![]() Excavation |
![]() Moled sewer pipe | ![]() Man-hole benching for new instalment |
![]() Relaying the grass/ground |
Client: Management Agency
Location: Brighton, East Sussex
Works: Drain repair of root removal and patch liner to seal broken joint that serves a block of flats
![]() Broken joint/root damage repair | ![]() Removal of roots |
---|---|
![]() Sealed with a new molded pipe | ![]() Patch Repair (new molded pipe) |
Client: Management Agency
Location: Rustington, West Sussex
Works: Installment of a new UPVC drainage system for a block of commercial office blocks
![]() Installation of Drainage system | ![]() Trenching for drainage install |
---|---|
![]() Backfill with shingle and MOT | ![]() Ready for tarmac finish |
Client: Home-owner
Location: Brighton, East Sussex
Works: Reconfigure of the Southern Water Sewer for a new extension on a property as per southern water specification.
![]() Road Closure for Sewer CCTV Survey | ![]() Temporary traffic light system |
---|---|
![]() Our crawler unit for pipe size 300mm | ![]() Crawler unit set-up |
Client: HOP Consulting Civil and Structural Engineers
Location: Shoreham, West Sussex
Works: CCTV drain survey of 300 & 525 mm main sewer for a new development
![]() Installation of Aco Drainage | ![]() Floor-saw to cut-out trench |
---|---|
![]() Excavator with hydraulic pecker | ![]() Excavating trench |
![]() Added reinforcement bars | ![]() Aco's installed with RC finish |
Client: Wine Manufacturer
Location: Worthing, West Sussex
Works: Installment of large industrial galvanised aco channel drainage for discharge of surface water and resistance of moving plant