South Lodge
The contract will consisted of:
​
• New temporary road into site
• Multi utility trench - Power, Telecommunications and fresh water mains
• Tankering & De-silting of Pond
• Excavation​​
• New PCC Wetwell pumping station.
• New 180mm fusion wielded HDPE drainage.
• New drainage system installation.
• New 125mm MDPE rising main.
-
New drainage 300mm SW Drainage
• New sustainable water storage
-
Main Surface Water Diversion
• Refilling of Pond.
Essex Highways
Works consisted of:
​
397m of DN150 liner
242m of DN225 liner
20 CIPPs
328m of root cutting
10 connections reopened
Pre-cleaning
CCTV surveying


Langney Shopping Centre
​The contract consisted of:
​
• 34m of new heavy duty ACO drainage.
• 40m of new surface water below ground drainage.
• 3000L 3 stage Separator installation
• 2 x precast concrete catch pits.
• 4m deep main sewer connection.
Network Rail
​The contract consisted of:
​
• Cleansing and de-silting works all on accessible surface water drainage
• To CCTV survey with crawler
and inspect the various inspection chambers within the estate to check for any blockages and for any additional cleansing works.


Crawley Down
​The contract consisted of:
​
• Cleansing and de-silting works all on accessible surface water drainage
• To lift and inspect the various inspection chambers within the estate to check for any blockages and for any additional cleansing works.
Hermitage Park
​The contract consisted of:
​
• To undertake the pre-cleaning & CCTV Surveying of the highway gullies for adoption of a new build estate.
​


Langney Shopping Centre
​The contract consisted of:
​
• 34m of new heavy duty ACO drainage.
• 40m of new surface water below ground drainage.
• 3000L 3 stage Separator installation
• 2 x precast concrete catch pits.
• 4m deep main sewer connection.
Greenacres
The contract consisted of:
​
• Installation of 2no. 6.5 cubic meter soakaways.
• Installation of 50 linear meters of 100mm diameter drain liner.
• Installation of 40 linear meters of 100mm diameter drainage pipe.
​
Aquatech were contracted to undertake the renewal of the surface water drainage system for a residential block property. The old soakaways required updating to new 6.5 cubic meters PCC perforated rings. The old below ground pipework serving the internal rainwater pipes underneath the block, was defected pitch fibre. Aquatech successfully completed the drain liner of all pitch fibre pipework to increase its life span.


Littlehampton
​The contract consisted of:
​
• Cleansing and de-silting works all on accessible surface water drainage
• To lift and inspect the various inspection chambers within the estate to check for any blockages and for any additional cleansing works.