Aquatech Drain Services

Our Drain Services Projects
Here are few of many projects that Aquatech have completed:
![]() Drain Cleansing | ![]() Highway Drainage Survey |
---|---|
![]() drain crawler unit | ![]() Aquatech Drains |
![]() JetVac Tanker | ![]() Storm Water Drainage |
Client: Mildren Construction
Location: Chichester, West Sussex
Works: Carry-out a full drainage cleanse of the highway drainage and a CCTV Drain Survey check over for the Client.
![]() Saw-cut into existing concrete slab for ACO drainage instalment | ![]() ACO Channel drainage instalment on a concrete base with reinforcement |
---|---|
![]() drainage excavation works | ![]() ACO drainage installed |
![]() Completed ACO channel drainage and fully surrounded in high strength concrete |
Client: Technetix Ltd
Location: Albourne, West Sussex
Works: Instalment of 20m of Industrial ACO channel drainage to discharge all surface water and reduce any flooding.
![]() Soakaway Repair | ![]() Aquatech Drains Excavations |
---|---|
![]() New Soakaway Installed | ![]() New Pipework Inlet to Soakaway |
![]() New Surface Water Gully Installed |
Client: Property Management Company
Location: Brighton, East Sussex
Works: A new 8x Polystorm Soakaway Installation serving the Surface Water Run Off.
Client: Chalk Nightclub
Location: Brighton, East Sussex
Works: 4,500L sewage pumping chamber install to discharge foul water from the soil stack to the main sewer.
![]() sewage pumping chamber | ![]() concrete slab |
---|---|
![]() sewage pump pipe trench | ![]() Sewage inlet, cable duct & vent pipe |
![]() sewage tank | ![]() C20 concrete backfill |
![]() sewage tank surround | ![]() pumping chamber |
![]() concrete finish | ![]() soil stack connection &control panel |
Client: Homeowner
Location: East Sussex
Works: Main sewer diversion for a new build. Installing new 150mm clay pipe specified by Southern Water to resist high pressures
![]() Sewer diversion for a new build | ![]() Replacing & diverting with clay-pipe |
---|---|
![]() Diverting main sewer | ![]() Open joint for man-hole instalment |
![]() Concrete man-hole ring installed | ![]() all pipe-work surrounded in shingle |
![]() Build-up of man-hole | ![]() Mna-hole instalment for sewer access |
![]() Man-hole instalment |
Client: Mildren Construction
Location: A27 By-pass, West Sussex
Works: Installment of 3 Local Patch liners to repair damaged storm water drain under the highway
![]() Highway drainage patch repair | ![]() patch liner |
---|---|
![]() Drain lining | ![]() installment of drain lining |
![]() drain repair completion |
Client: Clancy Docwra
Location: Horsham, West Sussex
Works: Installment of 6" clay sewer pipe by excavation and moling
![]() Sub-contracting for Clancy Docwra | ![]() Moling for new sewer pipe |
---|---|
![]() Main sewer pipe installed | ![]() Excavation |
![]() Moled sewer pipe | ![]() Man-hole benching for new instalment |
![]() Relaying the grass/ground |
Client: Management Agency
Location: Brighton, East Sussex
Works: Drain repair of root removal and patch liner to seal broken joint that serves a block of flats
![]() Broken joint/root damage repair | ![]() Removal of roots |
---|---|
![]() Sealed with a new molded pipe | ![]() Patch Repair (new molded pipe) |
Client: Management Agency
Location: Rustington, West Sussex
Works: Installment of a new UPVC drainage system for a block of commercial office blocks
![]() Installation of Drainage system | ![]() Trenching for drainage install |
---|---|
![]() Backfill with shingle and MOT | ![]() Ready for tarmac finish |
![]() Southern Water Sewer build-over | ![]() Inspection Chamber Instalment |
---|---|
![]() Southern Water Sewer installment using clay pipework as per Souther Water specification | ![]() Surrounded all newly installed drainage in shingle as per Southern Water specification |
Client: Home-owner
Location: Brighton, East Sussex
Works: Reconfigure of the Southern Water Sewer for a new extension on a property as per southern water specification.
![]() Road Closure for Sewer CCTV Survey | ![]() Temporary traffic light system |
---|---|
![]() Our crawler unit for pipe size 300mm | ![]() Crawler unit set-up |
Client: HOP Consulting Civil and Structural Engineers
Location: Shoreham, West Sussex
Works: CCTV drain survey of 300 & 525 mm main sewer for a new development
![]() Installation of Aco Drainage | ![]() Floor-saw to cut-out trench |
---|---|
![]() Excavator with hydraulic pecker | ![]() Excavating trench |
![]() Added reinforcement bars | ![]() Aco's installed with RC finish |
Client: Wine Manufacturer
Location: Worthing, West Sussex
Works: Installment of large industrial galvanised aco channel drainage for discharge of surface water and resistance of moving plant
![]() Installing gully into communal main | ![]() Installed into communal main sewer |
---|---|
![]() Pipe fully surrounded with shingle |
Client: Homeowner
Location: Lewes, East Sussex
Works: Gully install to a communal main sewer and sealed with a patch liner
![]() Drain Repair in Hastings | ![]() Structural damage to 225mm sewer |
---|---|
![]() Drain patch lining to damaged 225mm sewer | ![]() Aquatech Drains repair crew |
Client: Commercial Client
Location: Hastings, East Sussex
Works: Drain repair patch lining to the structurally damages 225mm main sewer for an Industrial estate.
![]() Aquatech Drains Installation of New Soakaway System | ![]() Storm Water Drainage Solution |
---|---|
![]() Soakaway installed and surrounded in shingle | ![]() Storm crates wrapped in Terram for a long-last solution |
![]() Completed Soakaway Install |
Client: Property Management Client
Location: Seaford, East Sussex
Works: Installation of a new soakaway system to prevent future flooding of the properties entrance and exit.
![]() Road Gully Cleaning | ![]() Gully cleaning - before |
---|---|
![]() Gully cleaning - after | ![]() Combi Tanker Services |
Client: Brighton & Hove Council
Location: Woodingdean, East Sussex
Works: Road gully cleansing using our combi tanker on an Estate in Woodingdean.
![]() Industrial ACO Drainage | ![]() Surface Water Drainage |
---|---|
![]() ACO's embedded on C25 concrete | ![]() M200 ACO Linear Drainage |
![]() ACO Sump Unit | ![]() Drainage Setting Out |
![]() Drainage Excavation Works | ![]() ACO Drain Renewal |
Client: EDF Energy
Location: Brighton, East Sussex
Works: Installation of new M200 ACO Drainage to prevent further flooding and surface water issues.
![]() Southern Water Sewer Diversion | ![]() Southern Water Sewer Build Over |
---|---|
![]() Inspection Chambers | ![]() Sewer build over |
![]() main drainage installation | ![]() Drainage Excavations |
![]() Aquatech Drains |
Client: Homeowner
Location: Haywards Heath, West Sussex
Works: Southern Water Sewer Diversion for a new extension build over.
![]() Cut-out of soakway hole | ![]() Excavating hole for storm crates |
---|---|
![]() storm crates wrapped for protection | ![]() Road gully connection into soakaway |
![]() Fully surrounded in shingle | ![]() Concrete finish |
Client: Glynde House
Location: Hove, East Sussex
Works: Soakaway install to discharge storm water from road gully, holding a capacity of 1,200 litres of surface water
![]() 2x 2400 litre Sewage Pumping Stations Installation | ![]() Sewage Pumping Stations |
---|---|
![]() During the construction phase | ![]() Sewage Tanks Installed |
Client: Moretons Investments
Location: Brighton, East Sussex
Works: 2x 2400 litres Sewage Pumping Stations Installed for a new Residential Development.
![]() Culvert Cleaning | ![]() After Culvert Cleaning |
---|---|
![]() Before Culvert Cleaning | ![]() Culvert Full Cleansed |
Client: Property Management Company
Location: Lewes, East Sussex
Works: 900mm Diameter Culvert Cleaning using our 18T Combi Tanker Unit.
![]() Reinstatement | ![]() Drain Excavations |
---|---|
![]() Surface Water Drainage Installation | ![]() ACO's Installed |
![]() Connection to the Southern Water Main Sewer | ![]() |
Client: Homeowner
Location: Hassocks, West Sussex
Works: Installation of new Surface Water Drainage with the connection to the Southern Water Main Sewer.